BVN
Desktop click
in your Favorite Projects
block
click
in the BVN Project View
click the Design Review
tab
click
in the Product Design Review
section
click the Drawings
tab
Desktop click
in your Assigned projects
block
click
in the BVN Project View
click the Design Review
tab
click
in the Product Design Review
section
click the Drawings
tab
Desktop click
in your NDC block
click the Design Review
tab
click
in the Product Design Review
section
click the Drawings
tab
LPO
Desktop click
Todo
click the Product
design rev. tab
click
in the PDR list
click the Drawings
tab
Desktop click
in your Favorite Projects
block (for project IDs starting with
the initials PDR)
click the Drawings
tab
LPO & SAY
Desktop click
Search project
click
click
"Product Certification" in the action bar
click
in the BVN
Project View
click the Design
Review tab
click
in the Product Design
Review section
click the Drawings
tab
This tab is one of the 4 tabs of the PDR (along with the Product, the Characterist/ Tasks and the Comments tabs).
The tab contains a list of drawings/ revisions registered in the current PDR, for a selected subfile: from this list, you can consult the detail of each drawing.
Screen data
Project - Subfile: PDR identifier - name of subfile
Box: box number where paper drawing is physically stored in the LPO centre.
No.: order number, physical storage reference of drawing and revision, in your LPO centre.
Drawing nbr.: unique drawing identifier, common to all revisions of a drawing.
Rev.: revision number; if revision is the last revision of this drawing, the line is displayed in blue.
Title: drawing title.
CAD: link to electronic version of reviewed drawing, if any (the CAD reviewed field must be filled out in the revision detail screen, to be displayed here).
Pending comm.: number of pending comments attached to revision.
Status: since a revision may be registered in several subfiles, it may have several approval statuses: it is necessary to get a global status, that can be displayed in the list, for each revision. The approval status is displayed the following way:
if revision is registered in several subfiles, the system displays a global status in the list, as follow:
the status of current subfile is displayed first;
then, the least favourable status of revision among all subfiles is displayed in brackets. If it is not possible to get the least favourable status, the application displays a question mark in brackets.
For example: 1b (11) is the global status of revision:
it means the status of revision in current subfile is 1b and the least
favourable status of revision, among all subfiles it is registered in,
is 11.
if revision is registered in one subfile, the unique status is displayed in the column, and repeated in brackets.
Approval Date: date of revision approval.
Incoming mail ref.: reference of incoming mail containing drawing or revision, received in the LPO centre you belong to.
Outgoing mail ref.: reference of outgoing mail containing drawing and comments, sent by the LPO centre you belong to.
Screen features
In the drawings/ revisions list:
Click to
go to the drawing detail page.
Click to
open the CAD reviewed file associated to the drawing/ revision.
In the red & white action bar
Click Add drawing to get to the drawing registration form
In the blue action bar
Certificates list: list of certificates and reports for the PDR.
Assign Centre: choose a LPO centre to be in charge of PDR.
Assign surveyor: choose a surveyor to be in charge of PDR.
Done set the final status of PDR when the design review is over.
Reject: reject a PDR that has been assigned to your centre (status "Centre assigned") or to yourself as a surveyor (status "Surveyor assigned"), if you consider you are not the right centre/ surveyor to be in charge of it.
Cancel: cancel the current PDR
In the screen tabs
Product: general information on the PDR and the associated project
Characteristics/Tasks: characteristics and tasks retrieved from generic product and manually added
Comments: list of comments on PDR