This tab displays a general view of the project tree.
The project tree is made of:
the unit structure: tree structure of unit’s systems and products,
interventions (design reviews, product inspections, surveys at yard) required for systems and products.
|
Only the Project Manager (Leader) can modify the unit structure of a project. |
Screen data
Items of the unit structure are represented with icons:
|
System |
|
Product |
|
Design review |
|
Product inspection |
|
Survey at yard |
Click the symbols and
to unfold/ fold up a tree node.
The status of each intervention is represented with icons:
|
Undone |
|
Done |
The checklist's status of each BV activity (LPO, BVN, SAY) is displayed above the tree, on the right top hand.
|
But you may use the "View all" link (see below) to display all elements (even not applicable ones). However, not applicable elements are not considered in the certification process. |
Screen features
In the tree
Click the name of an element (system/ product/ intervention) to consult its detail:
System/ product (/
): Detail
of a located element
Design
review (): LPO
checklist
Product
inspection (): Product
folder
Survey
at yard (): Detail
of an intervention
|
You may not modify or delete the root node of a unit structure. |
Right-click a system/ product and select:
"Add Product" or "Add System" : add a new product/ system to the project tree
"Add Intervention": add a new intervention (design reviews, product inspections, surveys at yard)
"delete" : remove an item from the tree.
|
Only "Added" elements (manually added by Project Manager (Leader))
may be deleted. |
"make Applicable/ N/A": activate or deactivate an item (make it applicable or not applicable in the certification process).
|
When deactivating an element, you also deactivate its descendant elements
(System/ Product and Interventions). |
"duplicate"
: create a new product in the project tree by duplication.
Right-click an intervention and select:
"delete": remove the intervention.
|
Only "Added" interventions (manually added by Project Manager (Leader))
may be deleted. |
"make Applicable/ N/A": activate or deactivate an intervention (make it applicable or not applicable in the certification process).
"make
done/ undone": indicate if the intervention has been carried
out or is still in progress. The graphic status indicator will be updated
(: undone /
: done)
In the red & white action bar
View all: display the complete project tree (both Applicable and Non applicable items)
View Applicable: when in the "View All" mode, display the tree with only applicable items.
Non Located products: access to the list of products that are not located in the project tree
In the blue action bar
LPO
Project View: access to the LPO project view
BVN
Project View: access to the BVN project view
SAY
Project View: access to the SAY project view
In the screen tabs
Progress: statistics on the work in progress of each BV activity involved in the project
Project data: general information on the project
Unit data: technical characteristics of the unit (general, hull, machinery)
Class data: technical characteristics of the class
Statutory: international rules for which BV has been delegated by a country to control ship conformity
Contacts: list of the internal and external contacts associated to the project
Reports: list of reports on the project