The Checklist tab displays the list of categories defined for every subfiles of a project.

 

A category is a list of requested drawings, meant to be submitted by shipyard or manufacturer so that BV can perform the design review of a given project/ subfile. When registering a submitted drawing, you should link it to a category; once all drawings of a category are reviewed ok, you can set the category as Done (Complete). Once all categories are Done, the LPO contribution to the project is over.

In other words, drawings are classified in drawing categories, and categories make up the checklist of drawings to be reviewed for a given project/ subfile. A mandatory category is one that is automatically generated by the system, according to the project type.

A category can be:

 

On this page, each subfile is set on several lines: the first line displays the subfile name, the indicator, and the link "Add category". The following lines display the categories applied to the subfile (and their statuses), and for each category, the possibility to consult the list of "Drawings" as well as the category detail screen.

 

Screen data

Once all categories associated to a subfile are complete, the subfile's indicator automatically becomes "yes".

Once a category is complete for all subfiles it is associated to, it switches to Done in the project tree.

 

 