LPO
Desktop click
(Go to drawings) in the Favorite
Projects block
on the Drawings page, click "Multiselect"
in the action bar
click the Modify
multiple dwgs button
Desktop click
"Search drawing" in the action bar
on the result
page, click "Multiselect" in the action bar
click
the Modify multiple dwgs button
This window displays a modification form, where modifications will be applied on several drawings/ revisions at once. The page is laid out in two sections:
the modification form itself, holding the editable data fields;
a read-only drawing list, reminding the drawings that have been selected for multiple drawings modification: this section holds the same information on drawings as the Multiselect page.
Complete the form, using the following fields:
Box number: box number where paper drawing is physically stored in your centre.
Approval status: choose a status from the drop-down menu. The meaning and description of all statuses are detailed in a document called TNC 002.
Approval date: modify the date of approval for the selected drawings (type or use calendar tool)
Incoming mail: reference of incoming mail containing drawing or revision (sent from shipyard or manufacturer).
Date (of incoming mail): date the drawing or revision was received.
Outgoing mail: reference of outgoing mail containing drawing and comments (sent back to shipyard or manufacturer).
Date
(of outgoing mail): date the drawing or revision was sent back by BV.
Click to validate multiple drawings
modification: the modification is applied to all the drawings displayed
in the bottom section of this page (Selected drawings).
|
Only the modified fields are considered: if a field remains empty, it is not taken into account in the updating procedure. |
To leave multiple drawings modification without saving,
click .
In both cases, the system goes back to the drawings/
revisions list.